“RL CREATED DUE TO BOTH WINDLASSES COUPLINGS CLOSE TO WEAR LIMIT REQUIRED REPLACEMENT
AS PER TSI INSTRUCTION – MESSAGE 31276539 FROM 05/07/2022
CABLE LIFTER UNIT
MAKER: AKER SOLUTION
TYPE: J-26CU 46.15
S/N: W1-53259;W2-53261
CHAIN: 81MM
NOM. LOAD: 312KN
BRAKE HOLDING LOAD DESIGN:2174KN
PROJECT No: 4877-01″”” “BALL BEARING;
200 HWO 10 M.54
” AKER.NA.002315.00100
“RL CREATED DUE TO BOTH WINDLASSES COUPLINGS CLOSE TO WEAR LIMIT REQUIRED REPLACEMENT
AS PER TSI INSTRUCTION – MESSAGE 31276539 FROM 05/07/2022
CABLE LIFTER UNIT
MAKER: AKER SOLUTION
TYPE: J-26CU 46.15
S/N: W1-53259;W2-53261
CHAIN: 81MM
NOM. LOAD: 312KN
BRAKE HOLDING LOAD DESIGN:2174KN
PROJECT No: 4877-01″”” “CLAW COUPLING
” AKER.NA.311523.00000
“RL CREATED DUE TO BOTH WINDLASSES COUPLINGS CLOSE TO WEAR LIMIT REQUIRED REPLACEMENT
AS PER TSI INSTRUCTION – MESSAGE 31276539 FROM 05/07/2022
CABLE LIFTER UNIT
MAKER: AKER SOLUTION
TYPE: J-26CU 46.15
S/N: W1-53259;W2-53261
CHAIN: 81MM
NOM. LOAD: 312KN
BRAKE HOLDING LOAD DESIGN:2174KN
PROJECT No: 4877-01″”” “CLAW COUPLING;200 HWO 10 M.54
” AKER.NA.325310.00000
“RL CREATED DUE TO BOTH WINDLASSES COUPLINGS CLOSE TO WEAR LIMIT REQUIRED REPLACEMENT
AS PER TSI INSTRUCTION – MESSAGE 31276539 FROM 05/07/2022
CABLE LIFTER UNIT
MAKER: AKER SOLUTION
TYPE: J-26CU 46.15
S/N: W1-53259;W2-53261
CHAIN: 81MM
NOM. LOAD: 312KN
BRAKE HOLDING LOAD DESIGN:2174KN
PROJECT No: 4877-01″”” “SPHERICAL ROLLER BEARING
” AKER.NA.002316.00400
“RL CREATED DUE TO BOTH WINDLASSES COUPLINGS CLOSE TO WEAR LIMIT REQUIRED REPLACEMENT
AS PER TSI INSTRUCTION – MESSAGE 31276539 FROM 05/07/2022
CABLE LIFTER UNIT
MAKER: AKER SOLUTION
TYPE: J-26CU 46.15
S/N: W1-53259;W2-53261
CHAIN: 81MM
NOM. LOAD: 312KN
BRAKE HOLDING LOAD DESIGN:2174KN
PROJECT No: 4877-01″”” “O-RING
” AKER.NA.002440.15600
“RL CREATED DUE TO BOTH WINDLASSES COUPLINGS CLOSE TO WEAR LIMIT REQUIRED REPLACEMENT
AS PER TSI INSTRUCTION – MESSAGE 31276539 FROM 05/07/2022
CABLE LIFTER UNIT
MAKER: AKER SOLUTION
TYPE: J-26CU 46.15
S/N: W1-53259;W2-53261
CHAIN: 81MM
NOM. LOAD: 312KN
BRAKE HOLDING LOAD DESIGN:2174KN
PROJECT No: 4877-01″”” “V-RING
” AKER.NA.002454.00500
“RL CREATED DUE TO BOTH WINDLASSES COUPLINGS CLOSE TO WEAR LIMIT REQUIRED REPLACEMENT
AS PER TSI INSTRUCTION – MESSAGE 31276539 FROM 05/07/2022
CABLE LIFTER UNIT
MAKER: AKER SOLUTION
TYPE: J-26CU 46.15
S/N: W1-53259;W2-53261
CHAIN: 81MM
NOM. LOAD: 312KN
BRAKE HOLDING LOAD DESIGN:2174KN
PROJECT No: 4877-01″”” “BALL BEARING;
200 HWO 10 M.54
” AKER.NA.002315.00200
“RL CREATED DUE TO BOTH WINDLASSES COUPLINGS CLOSE TO WEAR LIMIT REQUIRED REPLACEMENT
AS PER TSI INSTRUCTION – MESSAGE 31276539 FROM 05/07/2022
CABLE LIFTER UNIT
MAKER: AKER SOLUTION
TYPE: J-26CU 46.15
S/N: W1-53259;W2-53261
CHAIN: 81MM
NOM. LOAD: 312KN
BRAKE HOLDING LOAD DESIGN:2174KN
PROJECT No: 4877-01″”” “SPLIT BEARING;
J(I) 26CU46.15+200HW15M.47
” AKER.NA.325818.00000
“RL CREATED DUE TO BOTH WINDLASSES COUPLINGS CLOSE TO WEAR LIMIT REQUIRED REPLACEMENT
AS PER TSI INSTRUCTION – MESSAGE 31276539 FROM 05/07/2022
CABLE LIFTER UNIT
MAKER: AKER SOLUTION
TYPE: J-26CU 46.15
S/N: W1-53259;W2-53261
CHAIN: 81MM
NOM. LOAD: 312KN
BRAKE HOLDING LOAD DESIGN:2174KN
PROJECT No: 4877-01″”” “SPLIT BEARING;
J(I) 26CU46.15+200HW15M.47
” AKER.NA.411114.00000